Year of construction: 2011
Location:Square “Macedonia”- Skopje
Main contractor: “Beton” Skopje
Subcontractor: “Mateo Design”
Short description: Construction of decorative elements made of natural marble (pillars, capitals, entablatures) and paving staircase.
GalleryYear of construction: 2007
Location:Centar Municipality, Skopje
Short description:Mateo Design was in charge of making the doors, and entry marble portals.
GalleryYear of construction: 2013
Location: Bank of “Vardar” river, Skopje
Main contractor: “Granit”- Skopje
Subcontractor: Bauer BG- Skopje/ Mateo Design
Short description: Facade engineering- using combination of facade tiles made of artificial granite with decorative elements from hard pressed polyurethane with a density of 180-220kg/m3
GalleryYear of construction: 2014
Location: Centar Municipality, Skopje
Main contractor: “Bauer BG- Skopje”
Subcontractor: “Mateo Design”
Short description: Engineering facade system- combination of marble boards made of natural white marble, insulating magnum boards and decorative elements of hard pressed polyurethane with a density of 250-350 kg/m3
GalleryYear of construction: 2015
Location: Centar Municipality, Skopje
Main contractor: “Alding Engineering”- Skopje
Subcontractor: “Mateo Design”
Short description: Making a complete facade solution, a combination of marble facade boards of natural white marble, insulating magnum boards, and decorative elements of hard pressed polyurethane density of 180-250kg / m3.
GalleryYear of construction: 2012
Location: The Square near the store “Most”
Main contractor: Beton- Skopje
Subcontractor: “Krin KG”- Prilep/ “Mateo Design”
Short description:Molding reliefs in stone for “Philip II” and “Olympia” fountain.
GalleryYear of construction: 2010
Location: Gazi Baba Municipality, Skopje
Main contractor: “Beton”- Skopje
Subcontractor: “Krin Proizvodstvo”/ “Mateo Design”
Short description: Mateo design molded relief in white marble, for a pedestal of a monument.
GalleryYear of construction: 2014
Location: Centar Municipality, Skopje
Main contractor: “Beton”- Stip
Subcontractor: ”Mateo Design”
Short description: Mateo Design made the entablature and decorated it with corbels and pilasters of hard pressed polyurethane with technique 160-220kg/m3.
GalleryYear of construction: 2011
Location Bank of “Vardar” river
Main contractor: “Granit”- Skopje
Subcontractor: “Krin KG”/ “Mateo Design”.
Short description: Mateo Design produced marble elements for some of the pillars which are part of the Constitutional Court.
GalleryYear of construction: 2015
Location Centar Municipality Str. Nikola Vapcarov No. 8 Str. Nikola Vapcarov No. 10 Str. Makedonija No. 1
Main contractor: Bauer BG-Skopje/Alding
Subcontractor: “Mateo Design”.
Short description: Facade engineering using combination of hard pressed polyurethane with a density 160-350/m3 and insulating magnum boards
ГалеријаYear of construction: 2015
Location Quay of Vardar
Main contractor: “Beton AD”- Skopje
Subcontractor: “Mateo Design”.
Short description: Making a complete facade solution, a combination of insulating magnum boards, and decorative elements of hard pressed polyurethane density of 200-220kg / m3.
Gallery